Floor Preparation
For a liquid screed to be installed successfully the correct preparation is essential. Monster Mix is able to offer all of the following within any quotation.
​
DPM – A plastic membrane must be installed to prevent contact with existing flooring or installation to prevent a reaction occurring. This must be lapped up the walls to create a ‘swimming pool’ effect.
​
Perimeter strip – A 5/10mm perimeter strip must be installed around all walls to the full depth of the screed. This is to cushion the screed to prevent cracking.
Joints – All joints need to be taped and upturns fixed at 150mm above screed levels.
​
-
Sub floor assessed to determine correct procedure
-
Primers and damp proof membranes installed professionally and to required standards
-
Polythene installed to required standards
-
Edging insulation installed to required standards
-
Custom manufactured materials at very competitive prices
-
Source everything you need from one supplier
-
Professional preparation means a smooth liquid screed installation
-
Professional help and advice from first contact to project completion